物理学 > 加速器物理
[提交于 2010年7月29日]
标题:Very Big Accelerators as Energy Producers
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:One consequence of the application of superconductivity to accelerator construction is that the power consumption of accelerators will become much smaller. This raises the old possibility of using high energy protons to make neutrons which are then absorbed by fertile uranium or thorium to make a fissionable material like plutonium that can be burned in a nuclear reactor. The Energy Doubler/Saver being constructed at Fermilab is to be a superconducting accelerator that will produce 1000 GeV protons. The expected intensity of about $10^{12}$ protons per second corresponds to a beam power of about 0.2 MW. The total power requirements of the Doubler will be about 20 MW of which the injector complex will use approximately 13 MW, and the refrigeration of the superconducting magnets will use about 7 MW. Thus the beam power as projected is only a few orders of magnitude less than the accelerator power. But each 1000 GeV proton will produce about 60,000 neutrons in each nuclear cascade shower that is releaseq in a block of uranium, and then most of these neutrons will be absorbed to produce 60,000 plutonium a toms. Each of these when burned will Subsequently release about 0.2 GeV of fission energy to make a total energy of 12,000 GeV (20 ergs) for each 1000 GeV proton. Inasmuch as megawatts are involved, it appears to be worthwhile to consider the cost of making the protons to see if there could be an overall energy production.
提交历史
来自:David Ritchie[v1] 2010年7月29日 星期四 21:35:16 UTC
当前浏览上下文:
physics
切换浏览方式为: