物理学 > 加速器物理
[提交于 2018年2月12日]
标题:Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth >23 MHz. The system meets the requirements for CLIC.
提交历史
来自:Jack Roberts[v1] 2018年2月12日 星期一 00:00:00 UTC