计算机科学 > 离散数学
[提交于 2012年3月14日]
标题:An efficient algorithm for generating AoA networks
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:The activities, in project scheduling, can be represented graphically in two different ways, by either assigning the activities to the nodes 'AoN' directed acyclic graph (dag) or to the arcs 'AoA dag'. In this paper, a new algorithm is proposed for generating, for a given project scheduling problem, an Activity-on-Arc dag starting from the Activity-on-Node dag using the concepts of line graphs of graphs.
提交历史
来自:Mouhoub Nasser Eddine[v1] 2012年3月14日 星期三 20:11:26 UTC