物理学 > 加速器物理
[提交于 2012年8月16日]
标题:Status and specifications of a Project X front-end accelerator test facility at Fermilab
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility.
提交历史
来自:Steimel, James M.[v1] 2012年8月16日 星期四 16:15:59 UTC