物理学 > 加速器物理
[提交于 2012年8月16日]
标题:A gap clearing kicker for Main Injector
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.
提交历史
来自:Kourbanis, Ioanis[v1] 2012年8月16日 星期四 16:27:40 UTC