物理学 > 加速器物理
[提交于 2012年9月19日]
标题:Experiences with permanent magnets at the Fermilab recycler ring
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:In order to achieve higher luminosities in Run II a separate antiproton storage ring was built in the Main Injector tunnel. To reduce both construction and operations costs permanent magnets were used. This paper discusses the design criterion and specifications, including temperature dependence, longitudinal uniformity, and adjusting of the higher harmonics of the magnets. The design tolerances for a storage ring are more stringent than for a single pass beam line. The difference between the measured and ideal central field for each magnet was held to better than 0.1%. The temperature stability for all magnets was set to better than 0.01% per degree Celsius. Higher order harmonics relative to the central field were set to less than 0.01%. This was done for all 484 permanent magnet that were built.
提交历史
来自:Volk, James T.[v1] 2012年9月19日 星期三 18:31:48 UTC