物理学 > 加速器物理
[提交于 2013年1月9日]
标题:Positron Source Simulations for ILC 1 TeV Upgrade
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:The generation and capture of polarized positrons at a source with a superconducting helical undulator having 4.3 cm period and 500 GeV electron drive beam have been simulated. The positron polarization has been calculated for the different undulator K values (up to K = 2.5). Without applying a photon collimator, the maximal polarization of positrons is about 25% for 231 meters active magnet length of undulator with K = 0.7. Using an undulator with K = 2.5 and a collimator with an aperture radius of 0.9 mm results in increase of positron polarization to 54%. The energy deposition, temperature rise and stress induced by high intense photon beam in the rotated titanium-alloy target have been estimated. The maximal thermal stress in the target is about 224 MPa for the source with photon collimation to achieve a positron polarization of 54%.
提交历史
来自:Andriy Ushakov[v1] 2013年1月9日 星期三 00:00:00 UTC