物理学 > 加速器物理
[提交于 2013年1月23日]
标题:Transport from the Recycler Ring to the Antiproton Source Beamlines
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:In the post-Nova era, the protons are directly transported from the Booster ring to the Recycler ring rather than the Main Injector. For Mu2e and g-2 project, the Debuncher ring will be modified into a Delivery ring to deliver the protons to both Mu2e and g-2 experiemnts. Therefore, It requires the transport of protons from the Recycler Ring to the Delivery ring. A new transfer line from the Recycler ring to the P1 beamline will be constructed to transport proton beam from the Recycler Ring to existing Antiproton Source beamlines. This new beamline provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. This paper presents the Conceptual Design of this new beamline.
提交历史
来自:Xiao, Meiqin[v1] 2013年1月23日 星期三 19:17:23 UTC