标题:Alignment and Aperture Scan at the Fermilab Booster
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is going to be the source of issues. The booster accelerates beam from 400 MeV to 8 GeV and extracts to the Main Injector. Several percent of the beam is lost within 3 msec after the injection. The aperture at injection energy was measured and compared with the survey data. The magnets are going to be realigned in March 2012 in order to increase the aperture. The beam studies, analysis of the scan and alignment data, and the result of the magnet moves will be discussed in this paper.
提交历史
来自:Seiya, Kiyomi[v1] 2013年1月30日 星期三 20:33:26 UTC