跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

物理学 > 加速器物理

arXiv:1411.5540 (physics)
[提交于 2014年11月20日]

标题:Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC

作者:Taku Ishida
查看论文《Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future project with Hyper-Kamiokande. Based on five years of operational experience, the facility has achieved stable operation with 230 kW beam power without significant problems on the beam-line apparatus. After successful maintenance works in 2013-2014 to replace all electromagnetic horns and a production target, the facility is now ready to accomodate a 750-kW-rated beam. Also, the possibility of achieving a few to multi-MW beam operation is discussed in detail.
评论: 4 pages, 8 figures, talk presented at the 2nd international symposium on science at J-PARC (J-PARC 2014), Tsukuba, Ibaraki, Japan on July 2014
主题: 加速器物理 (physics.acc-ph); 高能物理 - 实验 (hep-ex); 仪器与探测器 (physics.ins-det)
报告编号: KEK Preprint 2014-34
引用方式: arXiv:1411.5540 [physics.acc-ph]
  (或者 arXiv:1411.5540v1 [physics.acc-ph] 对于此版本)
  https://doi.org/10.48550/arXiv.1411.5540

提交历史

来自:Taku Ishida
[v1] 2014年11月20日 星期四 13:15:17 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

physics.acc-ph
< 上一篇   |   下一篇 >
最新 | 近期 | 2014-11
切换浏览方式为:
physics
hep-ex
physics.ins-det

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站