物理学 > 加速器物理
[提交于 2015年2月6日]
标题:Status of the warm front end of PXIE
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.
提交历史
来自:Shemyakin, Alexander V.[v1] 2015年2月6日 星期五 00:00:00 UTC