物理学 > 加速器物理
[提交于 2015年2月9日]
标题:An 800-MeV superconducting LINAC to support megawatt proton operations at Fermilab
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was reduced to the support of the Long Base Neutrino Facility (LBNF) at the project first stage. The name of the facility was changed to the PIP-II (Proton Improvement Plan). This new facility is a logical extension of the existing Proton Improvement Plan aimed at doubling average power of the Fermilab's Booster and Main Injector (MI). Its design and required R&D are closely related to the Project X. The paper discusses the goals of this new facility and changes to the Project X linac introduced to support the goals.
提交历史
来自:Lebedev, Valeri A.[v1] 2015年2月9日 星期一 00:00:00 UTC