计算机科学 > 计算复杂性
[提交于 2015年7月8日]
标题:Towards Tight Lower Bounds for Scheduling Problems
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite structural hardness result of Bansal and Khot, we obtain a hardness of $2-\epsilon$ for the problem of minimising the makespan for scheduling precedence-constrained jobs with preemption on identical parallel machines. This matches the best approximation guarantee for this problem. Assuming the same hypothesis, we also obtain a super constant inapproximability result for the problem of scheduling precedence-constrained jobs on related parallel machines, making progress towards settling an open question in both lists of ten open questions by Williamson and Shmoys, and by Schuurman and Woeginger. The study of structural hardness of $k$-partite graphs is of independent interest, as it captures the intrinsic hardness for a large family of scheduling problems. Other than the ones already mentioned, this generalisation also implies tight inapproximability to the problem of minimising the weighted completion time for precedence-constrained jobs on a single machine, and the problem of minimising the makespan of precedence-constrained jobs on identical parallel machine, and hence unifying the results of Bansal and Khot, and Svensson, respectively.
提交历史
来自:Ashkan Norouzi-Fard[v1] 2015年7月8日 星期三 00:00:00 UTC