计算机科学 > 分布式、并行与集群计算
[提交于 2015年9月8日]
标题:Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:Quality control lead times are one of most significant causes of loss of time in the pharmaceutical and cosmetics industries. This is partly due to the organization of laboratories that feature parallel multipurpose machines for chromatographic analyses. The testing process requires long setup times and operators are needed to launch the process. The various controls are non-preemptive and are characterized by a release date, a due date and available routings. These quality processes lead to significant delays, and we therefore evaluate the total tardiness criterion. Previous heuristics were defined for the total tardiness criterion, parallel machines, and setup such as ATC (Apparent Tardiness Cost) and ATCS (ATC with setups). We propose new rules and a simulated annealing procedure in order to minimize total tardiness.
提交历史
来自:Francois Marmier[v1] 2015年9月8日 星期二 00:00:00 UTC