跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 分布式、并行与集群计算

arXiv:1510.05107 (cs)
[提交于 2015年10月17日]

标题:A Makespan Lower Bound for the Scheduling of the Tiled Cholesky Factorization based on ALAP scheduling

作者:Willy Quach, Julien Langou
查看论文《A Makespan Lower Bound for the Scheduling of the Tiled Cholesky Factorization based on ALAP scheduling》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:Due to the advent of multicore architectures and massive parallelism, the tiled Cholesky factorization algorithm has recently received plenty of attention and is often referenced by practitioners as a case study. It is also implemented in mainstream dense linear algebra libraries. However, we note that theoretical study of the parallelism of this algorithm is currently lacking. In this paper, we present new theoretical results about the tiled Cholesky factorization in the context of a parallel homogeneous model without communication costs. We use standard flop-based weights for the tasks. For a $t$-by-$t$ matrix, we know that the critical path of the tiled Cholesky algorithm is $9t-10$ and that the weight of all tasks is $t^3$. In this context, we prove that no schedule with less than $0.185 t^2$ processing units can finish in a time less than the critical path. In perspective, a naive bound gives $0.11 t^2.$ We then give a schedule which needs less than $0.25 t^2+0.16t+3$ processing units to complete in the time of the critical path. In perspective, a naive schedule gives $0.50 t^2.$ In addition, given a fixed number of processing units, $p$, we give a lower bound on the execution time as follows: $$\max( \frac{t^{3}}{p}, \frac{t^{3}}{p} - 3\frac{t^2}{p} + 6\sqrt{2p} - 7 , 9t-10).$$ The interest of the latter formula lies in the middle term. Our results stem from the observation that the tiled Cholesky factorization is much better behaved when we schedule it with an ALAP (As Late As Possible) heuristic than an ASAP (As Soon As Possible) heuristic. We also provide scheduling heuristics which match closely the lower bound on execution time. We believe that our theoretical results will help practical scheduling studies. Indeed, our results enable to better characterize the quality of a practical schedule with respect to an optimal schedule.
主题: 分布式、并行与集群计算 (cs.DC)
引用方式: arXiv:1510.05107 [cs.DC]
  (或者 arXiv:1510.05107v1 [cs.DC] 对于此版本)
  https://doi.org/10.48550/arXiv.1510.05107

提交历史

来自:Julien Langou
[v1] 2015年10月17日 星期六 09:18:39 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.DC
< 上一篇   |   下一篇 >
最新 | 近期 | 2015-10
切换浏览方式为:
cs

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站