跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

电气工程与系统科学 > 系统与控制

arXiv:1607.04255 (eess)
[提交于 2016年7月14日]

标题:Timed Supervisory Control for Operational Planning and Scheduling under Multiple Job Deadlines

作者:Ahmad Reza Shehabinia, Liyong Lin, Rong Su
查看论文《Timed Supervisory Control for Operational Planning and Scheduling under Multiple Job Deadlines》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:In this paper, we model an operational planning and scheduling problem under multiple job deadlines in a time-weighted automaton framework. We first present a method to determine whether all given job specifications and deadlines can be met by computing a supremal controllable job satisfaction sublanguage. When this supremal sublanguage is not empty, we compute one of its controllable sublanguages that ensures the minimum total job earliness by adding proper delays. When this supremal sublanguage is empty, we will determine the minimal sets of job deadlines that need to be relaxed.
主题: 系统与控制 (eess.SY); 系统与控制 (cs.SY)
引用方式: arXiv:1607.04255 [eess.SY]
  (或者 arXiv:1607.04255v1 [eess.SY] 对于此版本)
  https://doi.org/10.48550/arXiv.1607.04255

提交历史

来自:Ahmad Reza Shehabinia
[v1] 2016年7月14日 星期四 19:28:51 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

eess.SY
< 上一篇   |   下一篇 >
最新 | 近期 | 2016-07
切换浏览方式为:
eess
cs.SY

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站