标题:An Optimized Analogy-Based Project Effort Estimation

作者:Mohammad Azzeh, Yousef Elsheikh, Marwan Alseid
查看论文《An Optimized Analogy-Based Project Effort Estimation》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:Despite the predictive performance of Analogy-Based Estimation (ABE) in generating better effort estimates, there is no consensus on how to predict the best number of analogies, and which adjustment technique produces better estimates. This paper proposes a new adjusted ABE model based on optimizing and approximating complex relationships between features and reflects that approximation on the final estimate. The results show that the predictive performance of ABE has noticeably been improved, and the number of analogies was remarkably variable for each test project.
主题: 软件工程 (cs.SE)
引用方式: arXiv:1703.04563 [cs.SE]
  (或者 arXiv:1703.04563v1 [cs.SE] 对于此版本)
  https://doi.org/10.48550/arXiv.1703.04563

提交历史

来自:Mohammad Azzeh
[v1] 2017年3月11日 星期六 20:34:05 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.SE
< 上一篇   |   下一篇 >
最新 | 近期 | 2017-03
切换浏览方式为:
cs

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站