跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 软件工程

arXiv:1703.04565 (cs)
[提交于 2017年3月11日]

标题:Fuzzy Model Tree For Early Effort Estimation

作者:Mohammad Azzeh, Ali Bou Nassif
查看论文《Fuzzy Model Tree For Early Effort Estimation》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:Use Case Points (UCP) is a well-known method to estimate the project size, based on Use Case diagram, at early phases of software development. Although the Use Case diagram is widely accepted as a de-facto model for analyzing object oriented software requirements over the world, UCP method did not take sufficient amount of attention because, as yet, there is no consensus on how to produce software effort from UCP. This paper aims to study the potential of using Fuzzy Model Tree to derive effort estimates based on UCP size measure using a dataset collected for that purpose. The proposed approach has been validated against Treeboost model, Multiple Linear Regression and classical effort estimation based on the UCP model. The obtained results are promising and show better performance than those obtained by classical UCP, Multiple Linear Regression and slightly better than those obtained by Tree boost model.
主题: 软件工程 (cs.SE); 人工智能 (cs.AI)
引用方式: arXiv:1703.04565 [cs.SE]
  (或者 arXiv:1703.04565v1 [cs.SE] 对于此版本)
  https://doi.org/10.48550/arXiv.1703.04565

提交历史

来自:Mohammad Azzeh
[v1] 2017年3月11日 星期六 20:24:06 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.SE
< 上一篇   |   下一篇 >
最新 | 近期 | 2017-03
切换浏览方式为:
cs
cs.AI

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站