跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 计算工程、金融与科学

arXiv:1707.03686 (cs)
[提交于 2017年7月13日]

标题:Methodology for Multi-stage, Operations- and Uncertainty-Aware Placement and Sizing of FACTS Devices in a Large Power Transmission System

作者:Vladimir Frolov, Michael Chertkov
查看论文《Methodology for Multi-stage, Operations- and Uncertainty-Aware Placement and Sizing of FACTS Devices in a Large Power Transmission System》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:We develop new optimization methodology for planning installation of Flexible Alternating Current Transmission System (FACTS) devices of the parallel and shunt types into large power transmission systems, which allows to delay or avoid installations of generally much more expensive power lines. Methodology takes as an input projected economic development, expressed through a paced growth of the system loads, as well as uncertainties, expressed through multiple scenarios of the growth. We price new devices according to their capacities. Installation cost contributes to the optimization objective in combination with the cost of operations integrated over time and averaged over the scenarios. The multi-stage (-time-frame) optimization aims to achieve a gradual distribution of new resources in space and time. Constraints on the investment budget, or equivalently constraint on building capacity, is introduced at each time frame. Our approach adjusts operationally not only newly installed FACTS devices but also other already existing flexible degrees of freedom. This complex optimization problem is stated using the most general AC Power Flows. Non-linear, non-convex, multiple-scenario and multi-time-frame optimization is resolved via efficient heuristics, consisting of a sequence of alternating Linear Programmings or Quadratic Programmings (depending on the generation cost) and AC-PF solution steps designed to maintain operational feasibility for all scenarios. Computational scalability and application of the newly developed approach is illustrated on the example of the 2736-nodes large Polish system. One most important advantage of the framework is that the optimal capacity of FACTS is build up gradually at each time frame in a limited number of locations, thus allowing to prepare the system better for possible congestion due to future economic and other uncertainties.
评论: paper is accepted for presentation at IREP 2017. arXiv admin note: text overlap with arXiv:1608.04467
主题: 计算工程、金融与科学 (cs.CE); 优化与控制 (math.OC); 应用物理 (physics.app-ph)
引用方式: arXiv:1707.03686 [cs.CE]
  (或者 arXiv:1707.03686v1 [cs.CE] 对于此版本)
  https://doi.org/10.48550/arXiv.1707.03686

提交历史

来自:Vladimir Frolov
[v1] 2017年7月13日 星期四 00:00:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.CE
< 上一篇   |   下一篇 >
最新 | 近期 | 2017-07
切换浏览方式为:
cs
math.OC
physics.app-ph

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站