跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 计算工程、金融与科学

arXiv:1802.01492 (cs)
[提交于 2018年2月6日]

标题:Analysing the Degree of Meshing in Medium Voltage Target Grids - An Automated Technical and Economical Impact Assessment

作者:Leon Thurner, Alexander Scheidler, Alexander Probst, Martin Braun
查看论文《Analysing the Degree of Meshing in Medium Voltage Target Grids - An Automated Technical and Economical Impact Assessment》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:There are different MV grid concepts with regard to mode of operation and protection system layout. The increasing installation of DG raises the question if the currently used concepts are still optimal for future power systems. We present a methodology that allows the automated calculation and comparison of target grids within different concepts. Specifically, we consider radial grids, closed ring grids and grids with switching stations. A target grid structure is optimized for each of those grid concepts based on geographical information. To model a realistic planning process, compliance with technical constraints for normal operation, contingency behaviour and reliability figures are ensured in all grid concepts. We present a multiphase approach to solve the optimization problem based on an iterated local search meta-heuristic. We then economically compare the grids with regards to CAPEX and OPEX for primary and secondary equipment, to analyse which concept leads to the most overall cost-efficient target grids. Since the methodology allows an automated evaluation of a large number of grids, it can be used to draw general conclusions about the cost-efficiency of specific concepts. The methodology is applied to 44 real MV grids spanning about 4800km of lines, for which the results show that a radial grid structure is overall cost efficient compared to grid topologies with switching stations or closed rings even in grid areas with a large DG penetration. The contribution of this paper is threefold: first, a comprehensive methodology to compile automated target grid plans under realistic premises is presented. Second, the practical applicability of the approach is demonstrated with a large scale case study with a high degree of automation. And third, the results of the case study allow to draw conclusions about the techno-economical differences of different MV grid concepts.
主题: 计算工程、金融与科学 (cs.CE)
引用方式: arXiv:1802.01492 [cs.CE]
  (或者 arXiv:1802.01492v1 [cs.CE] 对于此版本)
  https://doi.org/10.48550/arXiv.1802.01492

提交历史

来自:Leon Thurner
[v1] 2018年2月6日 星期二 00:00:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.CE
< 上一篇   |   下一篇 >
最新 | 近期 | 2018-02
切换浏览方式为:
cs

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站