物理学 > 加速器物理
[提交于 2018年2月15日]
标题:Injection orbit matching for CSNS/RCS
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:The Rapid Cycling Synchrotron(RCS) of China Spallation Neutron Source(CSNS) employs painting injection to achieve uniform beam distribution and suppress space-charge effects. In the painting injection, the mismatch between the injection beam orbit and circulating orbit could make the non-uniformity of beam distribution and emittance growth, which may lead to beam loss. To match the injection beam orbit and the circulating beam orbit, it is necessary to identify the orbit of injection beam relative to the circulating orbit in the injection point. However, it's hard to measure this relative injection orbit directly. Theoretically, the relative injection beam orbit can be deduced by measuring the turn-by-turn beam position of a single turn injection beam. However, the intensity of single turn injected beam is too low to be measured with sufficient signal-noise ratio by using beam position monitor(BPM). In this paper, two effective methods based on multi-turn injection and turn-by-turn BPM are given to perform the match between the injection and the circulating beam orbit. The simulation results and application in the beam commissioning of CSNS/RCS show the validity of the methods.
提交历史
来自:Xiaohan Lu[v1] 2018年2月15日 星期四 01:47:09 UTC