跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

物理学 > 加速器物理

arXiv:1805.02725 (physics)
[提交于 2018年5月9日]

标题:Commissioning And First Results From The Fermilab Cryomodule Test Stand

作者:E. R. Harms, M. Awida, C. Baffes, K. Carlson, S. Chandrasekaran, B. Chase, E. Cullerton, J. Edelen, J. Einstein-Curtis, C. Ginsburg, A. Grassellino, B. Hansen, J. Holzbauer, S. Kazakov, T. Khabiboulline, M. Kucera, J. Leibfritz, A. Lunin, D. McDowell, M. McGee, D. Nicklaus, D. Orris, J. Ozelis, J. Patrick, T. Petersen, Y. Pischalnikov, P. Prieto, O. Prokofiev, J. Reid, W. Schappert, D. Sergatskov, N. Solyak, R. Stanek, D. Sun, M. White, C. Worel, G. Wu
查看论文《Commissioning And First Results From The Fermilab Cryomodule Test Stand》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
评论: 4 pp. Proceedings of LINAC2016, East Lansing, MI, USA
主题: 加速器物理 (physics.acc-ph)
报告编号: Fermilab-Conf-16-744-AD-APC-TD
引用方式: arXiv:1805.02725 [physics.acc-ph]
  (或者 arXiv:1805.02725v1 [physics.acc-ph] 对于此版本)
  https://doi.org/10.48550/arXiv.1805.02725

提交历史

来自:Harms, Elvin R.
[v1] 2018年5月9日 星期三 00:00:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

physics.acc-ph
< 上一篇   |   下一篇 >
最新 | 近期 | 2018-05
切换浏览方式为:
physics

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站