跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

物理学 > 加速器物理

arXiv:1806.05708 (physics)
[提交于 2018年6月14日]

标题:PIP-II Injector Test Warm Front End: Commissioning Update

作者:L. Prost, R. Andrews, C. Baffes, J. -P. Carneiro, B. Chase, A. Chen, E. Cullerton, P. F. Derwent, J. P. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, J. Steimel, D. Sun, A. Warner, C. Richard, V. L. S. Sista
查看论文《PIP-II Injector Test Warm Front End: Commissioning Update》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
评论: 4 pp
主题: 加速器物理 (physics.acc-ph)
报告编号: Fermilab-Conf-18-017-AD
引用方式: arXiv:1806.05708 [physics.acc-ph]
  (或者 arXiv:1806.05708v1 [physics.acc-ph] 对于此版本)
  https://doi.org/10.48550/arXiv.1806.05708

提交历史

来自:Prost, Lionel R.
[v1] 2018年6月14日 星期四 19:12:19 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

physics.acc-ph
< 上一篇   |   下一篇 >
最新 | 近期 | 2018-06
切换浏览方式为:
physics

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站