跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 人工智能

arXiv:1909.08247 (cs)
[提交于 2019年9月18日]

标题:Google vs IBM: A Constraint Solving Challenge on the Job-Shop Scheduling Problem

作者:Giacomo Da Col, Erich Teppan
查看论文《Google vs IBM: A Constraint Solving Challenge on the Job-Shop Scheduling Problem》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:The job-shop scheduling is one of the most studied optimization problems from the dawn of computer era to the present day. Its combinatorial nature makes it easily expressible as a constraint satisfaction problem. In this paper, we compare the performance of two constraint solvers on the job-shop scheduling problem. The solvers in question are: OR-Tools, an open-source solver developed by Google and winner of the last MiniZinc Challenge, and CP Optimizer, a proprietary IBM constraint solver targeted at industrial scheduling problems. The comparison is based on the goodness of the solutions found and the time required to solve the problem instances. First, we target the classic benchmarks from the literature, then we carry out the comparison on a benchmark that was created with known optimal solution, with size comparable to real-world industrial problems.
评论: In Proceedings ICLP 2019, arXiv:1909.07646
主题: 人工智能 (cs.AI); 性能 (cs.PF)
引用方式: arXiv:1909.08247 [cs.AI]
  (或者 arXiv:1909.08247v1 [cs.AI] 对于此版本)
  https://doi.org/10.48550/arXiv.1909.08247
期刊参考: EPTCS 306, 2019, pp. 259-265
相关 DOI: https://doi.org/10.4204/EPTCS.306.30

提交历史

来自:EPTCS
[v1] 2019年9月18日 星期三 07:08:10 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.AI
< 上一篇   |   下一篇 >
最新 | 近期 | 2019-09
切换浏览方式为:
cs
cs.PF

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站