计算机科学 > 数据结构与算法
[提交于 2021年5月11日]
标题:A 3-approximation list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource and total weighted completion time criterion
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the case where each job's weight in the objective function is proportional to its resource consumption amount. The problem is known to be NP-hard in this case. We propose a 3-approximation list scheduling algorithm for this problem. Besides, we show that the approximation ratio 3 is tight for the algorithm.
提交历史
来自:Susumu Hashimoto[v1] 2021年5月11日 星期二 01:11:36 UTC