跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

数学 > 优化与控制

arXiv:2111.02099 (math)
[提交于 2021年11月4日]

标题:Large-scale hydropower models in StochasticPrograms.jl

作者:Martin Biel
查看论文《Large-scale hydropower models in StochasticPrograms.jl》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:We present three large-scale hydropower planning models implemented in our open-source software framework StochasticPrograms.jl developed using the Julia programming langugage. The framework provides an expressive syntax for formulating stochastic programming models and has distributed capabilities that can handle large-scale instances. The three models describe different case studies of the hydroelectric power plants in the Swedish river Skellefte\"alven. The models are two-stage stochastic programs with sampled scenarios that describe uncertain electricity prices and local water inflows. The first model is a day-ahead planning problem that concerns how to determine optimal order strategies in a day-ahead energy market. We pose this problem from the perspective of a hydropower producer, who participates in the Nordic day-ahead market and operates in the Swedish river Skellefte\"alven. We implement the day-ahead model using our computational tools and then solve large-scale instances of the problem in a distributed environment. A statistically significant value of running stochastic planning is obtained using a sample-based algorithm. Next, we consider a variation of the day-ahead problem that includes preventive maintenance scheduling. We show how intricate coordination between the submitteed market orders and the maintenance schedule results in a larger value of the stochastic solution than the day-ahead problem. The final model is a capacity expansion problem with a long planning horizon. The same methodology is applied as when solving the first two hydropower problems. However, the planning horizon is considerably longer, from one year up to 20 years compared to a 24 hour horizon. We note that the relative significance of the value of the stochastic solution is much greater when comparing to the extra profits incurred from the capacity expansion instead of the total profit.
评论: arXiv admin note: substantial text overlap with arXiv:1910.04510
主题: 优化与控制 (math.OC)
引用方式: arXiv:2111.02099 [math.OC]
  (或者 arXiv:2111.02099v1 [math.OC] 对于此版本)
  https://doi.org/10.48550/arXiv.2111.02099

提交历史

来自:Martin Biel
[v1] 2021年11月4日 星期四 00:00:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

math.OC
< 上一篇   |   下一篇 >
最新 | 近期 | 2021-11
切换浏览方式为:
math

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站