跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 程序设计语言

arXiv:2204.00870 (cs)
[提交于 2022年4月8日]

标题:Differential Cost Analysis with Simultaneous Potentials and Anti-potentials

作者:Đorđe Žikelić, Bor-Yuh Evan Chang, Pauline Bolignano, Franco Raimondi
查看论文《Differential Cost Analysis with Simultaneous Potentials and Anti-potentials》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:We present a novel approach to differential cost analysis that, given a program revision, attempts to statically bound the difference in resource usage, or cost, between the two program versions. Differential cost analysis is particularly interesting because of the many compelling applications for it, such as detecting resource-use regressions at code-review time or proving the absence of certain side-channel vulnerabilities. One prior approach to differential cost analysis is to apply relational reasoning that conceptually constructs a product program on which one can over-approximate the difference in costs between the two program versions. However, a significant challenge in any relational approach is effectively aligning the program versions to get precise results. In this paper, our key insight is that we can avoid the need for and the limitations of program alignment if, instead, we bound the difference of two cost-bound summaries rather than directly bounding the concrete cost difference. In particular, our method computes a threshold value for the maximal difference in cost between two program versions simultaneously using two kinds of cost-bound summaries -- a potential function that evaluates to an upper bound for the cost incurred in the first program and an anti-potential function that evaluates to a lower bound for the cost incurred in the second. Our method has a number of desirable properties: it can be fully automated, it allows optimizing the threshold value on relative cost, it is suitable for programs that are not syntactically similar, and it supports non-determinism. We have evaluated an implementation of our approach on a number of program pairs collected from the literature, and we find that our method computes tight threshold values on relative cost in most examples.
评论: Extended version of the PLDI 2022 paper
主题: 程序设计语言 (cs.PL)
引用方式: arXiv:2204.00870 [cs.PL]
  (或者 arXiv:2204.00870v1 [cs.PL] 对于此版本)
  https://doi.org/10.48550/arXiv.2204.00870

提交历史

来自:Đorđe Žikelić
[v1] 2022年4月8日 星期五 00:00:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.PL
< 上一篇   |   下一篇 >
最新 | 近期 | 2022-04
切换浏览方式为:
cs

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站