跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 数据结构与算法

arXiv:2312.03495 (cs)
[提交于 2023年12月7日]

标题:A Subexponential Time Algorithm for Makespan Scheduling of Unit Jobs with Precedence Constraints

作者:Jesper Nederlof, Céline M. F. Swennenhuis, Karol Węgrzycki
查看论文《A Subexponential Time Algorithm for Makespan Scheduling of Unit Jobs with Precedence Constraints》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard 3-field notation, it is known as $Pm|\text{prec}, p_j=1|C_{\max}$. Settling the complexity of $Pm|\text{prec}, p_j=1|C_{\max}$ even for $m=3$ machines is the last open problem from the book of Garey and Johnson [GJ79] for which both upper and lower bounds on the worst-case running times of exact algorithms solving them remain essentially unchanged since the publication of [GJ79]. We present an algorithm for this problem that runs in $(1+\frac{n}{m})^{\mathcal{O}(\sqrt{nm})}$ time. This algorithm is subexponential when $m = o(n)$. In the regime of $m=\Theta(n)$ we show an algorithm that runs in$\mathcal{O}(1.997^n)$ time. Before our work, even for $m=3$ machines there were no algorithms known that run in $\mathcal{O}((2-\varepsilon)^n)$ time for some $\varepsilon > 0$.
主题: 数据结构与算法 (cs.DS)
引用方式: arXiv:2312.03495 [cs.DS]
  (或者 arXiv:2312.03495v1 [cs.DS] 对于此版本)
  https://doi.org/10.48550/arXiv.2312.03495

提交历史

来自:Celine Swennenhuis
[v1] 2023年12月7日 星期四 00:00:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.DS
< 上一篇   |   下一篇 >
最新 | 近期 | 2023-12
切换浏览方式为:
cs

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站