数学 > 优化与控制
[提交于 2024年11月27日]
标题:Flow Shop Scheduling with Inter-Stage Flexibility and Blocking Constraints
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:We investigate a scheduling problem arising from a material handling and processing problem in a production line of an Austrian company building prefabricated house walls. The addressed problem is a permutation flow shop with blocking constraints in which the machine of at least one stage can process a number operations of two other stages in the system. This situation is usually referred to as multi-task or inter-stage flexibility. The problem is in general NP-hard, but we derive a number of special cases that can be solved in polynomial time. For the general case, we present a variety of heuristic algorithms, with a focus on matheuristics that are grounded in two different mixed-integer linear programming (MIP) formulations of the problem. These matheuristics leverage the strengths of exact optimization techniques while introducing flexibility to address limits on computation time. To assess the performance of the proposed approaches, we conduct an extensive computational study on randomly generated test cases based on real-world instances.
提交历史
来自:Andrea Pacifici[v1] 2024年11月27日 星期三 14:28:53 UTC