跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 网络与互联网体系结构

arXiv:2509.10479 (cs)
[提交于 2025年8月28日]

标题:Exploring Busy Period for Worst-Case Deadline Failure Probability Analysis

作者:Junyi Liu, Xu Jiang, Yuanzhen Mu, Wang Yi, Nan Guan
查看论文《Exploring Busy Period for Worst-Case Deadline Failure Probability Analysis》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:Busy period is a fundamental concept in classical deterministic real-time scheduling analysis. In this deterministic context, only one busy period - which starts at the critical instant - needs to be considered, which identifies the worst-case scenario and thus paves the way for the development of efficient and safe analysis techniques. However, a recent work has revealed that, in the context of \textit{probabilistic} real-time scheduling analysis, only considering critical instant is not safe. In this paper, we address this gap by systematically analyzing deadline miss probabilities across varying busy period starting points. We propose a novel method of Worst-Case Deadline Failure Probability (WCDFP) for probabilistic fixed-priority preemptive scheduling. Experimental results demonstrate significant improvements over state-of-the-art methods achieved by our proposed method.
主题: 网络与互联网体系结构 (cs.NI); 操作系统 (cs.OS)
引用方式: arXiv:2509.10479 [cs.NI]
  (或者 arXiv:2509.10479v1 [cs.NI] 对于此版本)
  https://doi.org/10.48550/arXiv.2509.10479

提交历史

来自:Junyi Liu
[v1] 2025年8月28日 星期四 09:27:50 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.NI
< 上一篇   |   下一篇 >
最新 | 近期 | 2025-08
切换浏览方式为:
cs
cs.OS

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站