计算机科学 > 社会与信息网络

arXiv:2603.07845 (cs)
[提交于 2026年3月8日]

标题:The Theory and Practice of Computing the Bus-Factor

作者:Sebastiano A. Piccolo, Pasquale De Meo, Giorgio Terracina, Gianluigi Greco
查看论文《The Theory and Practice of Computing the Bus-Factor》的 PDF
查看中文 PDF 查看原文 PDF EasyResearch 阅读
摘要:The bus-factor is a measure of project risk with respect to personnel availability, informally defined as the number of people whose sudden unavailability would cause a project to stall or experience severe delays. Despite its intuitive appeal, existing bus-factor measures rely on heterogeneous modeling assumptions, ambiguous definitions of failure, and domain-specific artifacts, limiting their generality, comparability, and ability to capture project fragmentation. In this paper, we develop a unified, domain-agnostic framework for bus-factor estimation by modeling projects as bipartite graphs of people and tasks and casting the computation of the bus-factor as a family of combinatorial optimization problems. Within this framework, we formalize and reconcile two complementary interpretations of the bus-factor, redundancy and criticality, corresponding to the Maximum Redundant Set and the Minimum Critical Set, respectively, and prove that both formulations are NP-hard. Building on this theoretical foundation, we introduce a novel bus-factor measure inspired by network robustness. Unlike prior approaches, the proposed measure captures both loss of coverage and increasing project fragmentation by tracking the largest connected set of tasks under progressive contributor removal. The resulting measure is normalized, threshold-free, and applicable across domains; we show that its exact computation is NP-hard as well. We further propose efficient linear-time approximation algorithms for all considered measures. Finally, we evaluate their behavior through a sensitivity analysis based on controlled perturbations of project structures, guided by expectations derived from project management theory. Our results show that the robustness-based measure behaves consistently with these expectations and provides a more informative and stable assessment of project risk than existing alternatives.
主题: 社会与信息网络 (cs.SI); 计算复杂性 (cs.CC); 数据结构与算法 (cs.DS)
引用方式: arXiv:2603.07845 [cs.SI]
  (或者 arXiv:2603.07845v1 [cs.SI] 对于此版本)
  https://doi.org/10.48550/arXiv.2603.07845

提交历史

来自:Sebastiano Piccolo
[v1] 2026年3月8日 星期日 23:29:08 UTC
全文链接:

访问论文:

  • 查看中文 PDF
  • 查看原文 PDF
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.SI
< 上一篇   |   下一篇 >
最新 | 近期 | 2026-03
切换浏览方式为:
cs
cs.CC
cs.DS

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站