计算机科学 > 分布式、并行与集群计算
[提交于 2026年5月4日]
标题:From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:For over a century, the electric grid has relied on a single statistical assumption: \emph{load diversity}, the principle that the uncorrelated demands of millions of small consumers produce a smooth, predictable aggregate. AI training data centers break that assumption. A single hyperscale training campus can draw power comparable to a mid-sized city, driven by one tightly synchronized job whose demand swings by hundreds of megawatts in seconds. This paper argues that the resulting entanglement of compute and power infrastructure requires a shift from implicit coexistence to explicit co-development between the historically decoupled data center and electric power industries. We introduce the distinct design principles, operational philosophies, and economic incentives of each sector, and show why their cultural and technical misalignment makes coordination difficult. We identify key research directions, from joint capacity planning, multi-timescale control, a compute--power protocol stack, to market innovation, that must be pursued to power the future of AI sustainably and reliably.
提交历史
来自:Noman Bashir[v1] 2026年5月4日 星期一 19:08:43 UTC