标题:Variable-Horizon Workforce Demand Forecasting with an Aggregate Demand Constraint for Construction Workforce Planning

作者:Hanbyeol Park, Jaehyeon Heo, Taekhyun Park, Minseong Kim, Hyerim Bae
查看论文《Variable-Horizon Workforce Demand Forecasting with an Aggregate Demand Constraint for Construction Workforce Planning》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:Workforce planning is a recurring operational decision during construction projects that requires accurate forecasts of the future workforce demand for individual tasks. However, in practice, tasks have different completion dates, resulting in variable forecast horizons. In addition, the sum of the predicted daily workforce demands must equal the total workforce allocation specified in advance. Most existing machine-learning (ML)-based forecasting models assume fixed-length outputs and do not explicitly impose an aggregate demand constraint, making them unsuitable for these operational requirements. To address this problem, this study proposes constraint-preserving residual allocation forecasting (CP-RAF). The CP-RAF represents an observed workforce demand time series as a coefficient vector and retrieves completed tasks with similar temporal shapes. Then, it estimates the allocation profile over the remaining task duration using similarity-weight averaging. The predefined remaining workforce demand for each task was distributed according to the estimated profile, and the forecast horizon was adjusted while retaining profile characteristics. This procedure accommodates variable forecast horizons while preserving the aggregate demand constraints. CP-RAF was evaluated using workforce demand field data. The results showed that CP-RAF outperformed eight baseline models in medium- and long-horizon fixed-length forecasting and maintained low forecast errors under variable-length forecasting. By directly incorporating operational constraints into the forecasting procedure, the proposed method provides a framework suitable for workforce allocation in construction practices.
主题: 计算工程、金融与科学 (cs.CE)
引用方式: arXiv:2608.05551 [cs.CE]
  (或者 arXiv:2608.05551v1 [cs.CE] 对于此版本)
  https://doi.org/10.48550/arXiv.2608.05551

提交历史

来自:Hanbyeol Park
[v1] 2026年8月6日 星期四 03:07:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.CE
< 上一篇   |   下一篇 >
最新 | 近期 | 2026-08
切换浏览方式为:
cs

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站