计算机科学 > 机器学习
[提交于 2026年10月3日 (v1),最后修订于 2026年11月24日 (此版本, v4)]
标题:Announced Breaks Separate Conformal Reliability from Frequency Calibration
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:A prediction interval should contain the outcome at a stated rate. Conformal prediction sets its width from past forecast errors. When the process behind a time series changes on an announced date, intervals set from errors before that break can stop covering. After Australia moved to five minute electricity settlement, a 90% interval fixed beforehand covered 51.5% of the next 400 days. One forecaster needs the next interval to cover, another a finished period's share of misses at 10%. We show that each need calls for its own restart at the date. We recompute the next interval from the $n$ errors since the break. If these errors are independent, its coverage comes within $O(n^{-1/2})$ of the stated rate, the best order attainable. For a finished period, we restart adaptive conformal inference (ACI). On bounded errors, if a floor under its width adds a bounded total, it brings the share of misses within $O(n^{-1})$ of target but promises nothing about the next interval. After a simulated mean shift of 5.0 noise standard deviations, recomputed intervals cover within 3.5 percentage points of 90% on average at the 50th forecast, a third closer than the 5.2 of the best of five baselines. Of nine announced breaks in power markets and at a central bank, restarting ACI gives a detectable gain only at the one large break.