跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

计算机科学 > 数据结构与算法

arXiv:2610.41821 (cs)
[提交于 2026年10月30日]

标题:Compressing the Lawler-Moore Dynamic Program for Weighted Tardy Jobs

作者:Klaus Jansen, Björn Schumacher, Corinna Wambsganz
查看论文《Compressing the Lawler-Moore Dynamic Program for Weighted Tardy Jobs》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:The classic scheduling problem of minimizing the total weight of tardy jobs ($P_m||\sum_jw_jU_j$) asks for a schedule of jobs each with a processing time, weight, and due date on a constant number of parallel identical machines. A job is late in a schedule if it completes after its due date, and an optimal schedule is one where the total weight of all late jobs is minimized. The classic dynamic programming algorithm of Lawler and Moore [Manag. Sci., 1969] solves this problem in $O(nd_{\max}^m)$ where $n$ is the number of jobs, $d_{\max}$ is the maximum due date of any job, and $m$ is the number of identical machines. We show that it is sufficient to only compute part of the dynamic program and obtain the running time $\tilde{O}(n + d_{\max}^{m + 1})$ where $\tilde{O}$ suppresses polylogarithmic factors. This affirmatively answers the open question posed by Hermelin, Molter, and Shabtay [INFORMS J. Comput., 2024], whether a running time of $\tilde{O}(n + d_{\max}^2)$ is possible on a single machine.
主题: 数据结构与算法 (cs.DS)
引用方式: arXiv:2610.41821 [cs.DS]
  (或者 arXiv:2610.41821v1 [cs.DS] 对于此版本)
  https://doi.org/10.48550/arXiv.2610.41821

提交历史

来自:Björn Schumacher
[v1] 2026年10月30日 星期五 14:41:17 UTC (15 KB)
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

cs.DS
< 上一篇   |   下一篇 >
最新 | 近期 | 2026-11
切换浏览方式为:
cs

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站