标题:A Robust Optimization Framework for Energy System Capacity Expansion under Line Outage Uncertainty

作者:Kamran Forghani, Lina Reichenberg, Fredrik Hedenus, Iegor Riepin
查看论文《A Robust Optimization Framework for Energy System Capacity Expansion under Line Outage Uncertainty》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:Capacity expansion models are widely used in climate and energy policy analysis to find optimal investments in generation, storage, and transmission. As the share of renewable generation grows, these models rely more on transmission lines to balance supply and demand across regions. Transmission lines, however, can fail due to aging, extreme weather, or accidents. Models that represent outages as time-dependent events come mainly from electrical engineering and are applied to small-scale systems, as they quickly become computationally intractable for inter-regional capacity expansion. We develop a capacity expansion model in which the risk of line failures shapes the investments in all parts of the system. We formulate it as a two-stage, scenario-based robust optimization problem that samples time-varying outage scenarios from a Markov model and hedges the investments against the most severe ones. To solve the model, we propose a memory-augmented Benders decomposition algorithm combined with Monte Carlo simulation that can handle thousands of scenarios. The selected plan is then evaluated with an out-of-sample simulation to bound the Value-at-Risk (VaR) of its system cost. In a 25-node case study of Germany and its neighboring countries, the gap between the lower bound and the simulated VaR bound is below 1%. We compare the robust plans with a deterministic plan, which assumes all lines are always available, and with a reserve-margin heuristic, which requires local firm capacity to be above peak demand. Like the heuristic, the robust plans nearly eliminate loss of load in 1000 simulated outage scenarios. Their mean system cost is within 0.2% of the deterministic plan and about 4.5% below the heuristic. Instead of adding more generation capacity, the robust approach mainly changes the type and location of capacity, for example, by spreading storage across the network.
评论: 27 pages, 8 figures, 10 tables
主题: 优化与控制 (math.OC); 系统与控制 (cs.SY); 系统与控制 (eess.SY)
引用方式: arXiv:2611.34113 [math.OC]
  (或者 arXiv:2611.34113v1 [math.OC] 对于此版本)
  https://doi.org/10.48550/arXiv.2611.34113

提交历史

来自:Kamran Forghani
[v1] 2026年11月25日 星期三 10:15:42 UTC (3,117 KB)
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

math.OC
< 上一篇   |   下一篇 >
最新 | 近期 | 2026-11
切换浏览方式为:
math
cs.SY
eess.SY

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站