跳到正文
EasyXiv 检索
投稿 关于 登录

按回车检索 · 直接输入编号(如 1706.03762)可跳转到论文

物理学 > 加速器物理

arXiv:1208.2018 (physics)
[提交于 2012年8月10日]

标题:Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab

作者:M. W. McGee, J. Leibfritz, A. Martinez, Y. Pischalnikov, W. Schappert
查看论文《Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule #1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered.
评论: 3 pp. Particle Accelerator, 24th Conference (PAC'11) 2011. 28 Mar - 1 Apr 2011. New York, USA
主题: 加速器物理 (physics.acc-ph)
报告编号: FERMILAB-CONF-11-074-AD
引用方式: arXiv:1208.2018 [physics.acc-ph]
  (或者 arXiv:1208.2018v1 [physics.acc-ph] 对于此版本)
  https://doi.org/10.48550/arXiv.1208.2018

提交历史

来自:Mcgee, Michael W.
[v1] 2012年8月10日 星期五 00:00:00 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

physics.acc-ph
< 上一篇   |   下一篇 >
最新 | 近期 | 2012-08
切换浏览方式为:
physics

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站