物理学 > 加速器物理
[提交于 2012年8月10日]
标题:Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读摘要:The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule #1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered.
提交历史
来自:Mcgee, Michael W.[v1] 2012年8月10日 星期五 00:00:00 UTC