标题:Post-disaster Repair Scheduling in Partially Automated Electricity Distribution Networks

作者:Yushi Tan, Arindam K. Das, Payman Arabshahi, Daniel S. Kirschen
查看论文《Post-disaster Repair Scheduling in Partially Automated Electricity Distribution Networks》的 PDF
查看原文 PDF 中文 PDF (下批处理) EasyResearch 阅读
摘要:Natural disasters require repairing all damaged components in electricity distribution networks. Optimal scheduling repair crews to minimize the aggregate duration of interruptions reduces the harm. We consider the fact that the number of switches is much smaller than the number of edges. The problem is modeled by a parallel identical machine scheduling with group soft precedence constraints to minimize the total weighted energization time. We propose an LP-based list scheduling algorithm and a conversion algorithm and analyze their theoretical performances.
主题: 优化与控制 (math.OC); 系统与控制 (cs.SY); 系统与控制 (eess.SY)
引用方式: arXiv:1906.06461 [math.OC]
  (或者 arXiv:1906.06461v1 [math.OC] 对于此版本)
  https://doi.org/10.48550/arXiv.1906.06461

提交历史

来自:Yushi Tan
[v1] 2019年6月15日 星期六 03:55:39 UTC
全文链接:

访问论文:

  • 查看原文 PDF
  • 中文 PDF (下批处理)
  • EasyResearch 阅读
  • TeX 源文件
  • arXiv 原文页面
查看许可

当前浏览上下文:

math.OC
< 上一篇   |   下一篇 >
最新 | 近期 | 2019-06
切换浏览方式为:
math
cs.SY
eess.SY

参考文献与引用

  • Google Scholar
  • Semantic Scholar

BibTeX 格式的引用

EasyXiv 是独立运营的中文预印本站点,与 arXiv 及康奈尔大学无隶属关系。 论文元数据与原文来自 arXiv.org,感谢 arXiv 提供开放获取服务。
关于 · 帮助 · 投稿指南 · 版权 · arXiv 原站